2011 Ontario Reliability Compliance Program Schedule

Each year NERC, NPCC Inc., and the IESO select a subset of reliability standards for monitoring. Market Participants are required to provide reliability compliance information under the IESO’s Ontario Reliability Compliance Program (ORCP).

The schedule for reliability compliance submissions by market participants is shown in the table below. 2011 ORCP Schedule and History of Changes Download (Revised December 12, 2011 | Originally Published January 26, 2011).

Please note the forms below are for information purposes only. Market Participants must submit the electronic certification forms using the IESO Reliability Compliance Tool accessed via the IESO Web Portal.

Included in 2010 IRCP? NERC Standards Group NERC
Standard
NPCC
Document
Description Reporting Frequency Target Submission Date Ontario Reporting Entity Form
Y PRC PRC-005-1
PRC-008-0
PRC-011-0
PRC-017-0
Directory 3 Maintenance Criteria for Bulk Power System Protection Annual Preliminary Submission 20-Jan-2011, Final Submission 31-May-2011 T, G, D, W 1521
Y PRC PRC-001-1   System Protection Coordination Annual 13-Jul-11 T, G 1637
Y       Emergency Preparedness Planning
Market Rules Chapter 5 - Power System Reliability
Market Manual 7.10 - Ontario Electricity Emergency Plan
Annual 13-Jul-11 T, G, D, W 1608
Y       Emergency Restoration Planning
Market Manual 7.8 - Ontario Power System Restoration Plan
Annual 13-Jul-11 T, G, D, W 1609
Y     Directory 12 Section 5.4 Generator Underfrequency Protection Requirements Annual 22-Aug-11 G 1718 Survey
Y     Directory 12 Section 5.2 Automatic Underfrequency Load Shedding consistent with NPCC's UFLS program requirement Annual 22-Aug-11 T, D, W 1719 Survey
Y     Directory 12 Section 5.2 Automatic Underfrequency Load Shedding consistent with NPCC's UFLS program requirement Annual TBD T, D, W 1518 Certification
Y FAC FAC-008-1   Facility Ratings Methodology Annual 6-Sep-11 T, G, W 1623
Y FAC FAC-009-1   Establish and Communicate Facility Ratings Annual 6-Sep-11 T, G, W 1624
New PRC PRC-023-1   Transmission Relay Loadability Annual 31-May-12 T, G, D 1738
Y CIP CIP-001-1a   Sabotage Reporting Annual 5-Oct-11 T, G, D, W 1610
Y CIP CIP-002-3   Cyber Security — Critical Cyber Asset Identification (a) Annual 5-Oct-11 T, G, W 1694
Y CIP CIP-003-3   Cyber Security — Security Management Controls (a) Annual 5-Oct-11 T, G, W 1695
Y CIP CIP-004-3   Cyber Security — Personnel & Training (a) Annual 5-Oct-11 T, G, W 1696
Y CIP CIP-005-3   Cyber Security — Electronic Security Perimeter(s) (a) Annual 5-Oct-11 T, G, W 1697
Y CIP CIP-006-3c   Cyber Security — Physical Security of Critical Cyber Assets (a) Annual 5-Oct-11 T, G, W 1698
Y CIP CIP-007-3   Cyber Security — Systems Security Management (a) Annual 5-Oct-11 T, G, W 1699
Y CIP CIP-008-3   Cyber Security — Incident Reporting and Response Planning (a) Annual 5-Oct-11 T, G, W 1700
Y CIP CIP-009-3   Cyber Security — Recovery Plans for Critical Cyber Assets (a) Annual 5-Oct-11 T, G, W 1701
Y     Directory 8 Section 5.7 Key Facility Critical Component Testing (c) Annual 7-Nov-11 T, G 1520
Y FAC FAC-003-1   Transmission Vegetation Management Program Annual TBD T 1526
Y NUC NUC-001-2   Nuclear Plant Interface Coordination (b) Annual 31-May-12 T, G, D 1704
Y PRC PRC-004-1
PRC-004-1a
  Analysis and Mitigation of Transmission and Generation Protection System Misoperations Annual 31-May-12 T, G, D, W 1522 & 1523
Y TOP TOP-002-2a
TOP-002-2b
  Normal Operations Planning Annual 31-May-12 G 1643
Y VAR VAR-002-1.1b   Generator Operation for Maintaining Network Voltage Schedules Annual 31-May-12 G 1571
Y EOP EOP-009-0   Documentation of Blackstart Generating Unit Test Results (d) Annual 31-May-12 G 1532
Y     Directory 9
Directory 10
Generator Gross/Net Real Power Capability & Generator Gross/Net Reactive Power Capability Upon request by IESO   G 1635 & 1710
New PRC PRC-016-0.1   Special Protection System Misoperations Exception Reporting   T, G, D  
Y FAC FAC-003-1   Transmission Vegetation Management Program Exception Reporting   T 1527
T - Transmitter; G - Generator; D - Distributor; W - Connected Wholesale Customer
(a) Applicable to those market participants identified by the IESO as owners of Critical Assets.
(b) Applicable only to those market participants notified by the IESO.
(c) Applicable to those market participants identified by the IESO as owners of key facilities.
(d) Applicable to certified black start facility owners.
 