Current Market Rule Amendments
The links below provide information relating to each market rule amendment currently under
consideration by the Technical Panel or approved by the IESO Board but have not yet been
incorporated into a baseline. The market rule amendment process is described on the
Rule Amendment Process page. Amendments that are already incorporated
into a baseline appear on the Amendment Archive page.
MR-00402 - Renewable Integration Initiative Market Rules True-Up: Market Schedule, CMSC, Communications for Variable Generation Dispatch
Last Updated: May 2, 2013 |
Chapters 5, 7, 9 |
| Amendment Submission Q00 |
Amendment Proposal R00: Market Schedule and CMSC for Variable Generation The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by April 18, 2013, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00: Market Schedule and CMSC for Variable Generation |
Amendment Proposal R01: Communications for Variable Generation Dispatch The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by April 18, 2013, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R01: Communications for Variable Generation Dispatch |
MR-00401 - Removal of the Capacity Reserve and Energy Forward Market
Last Updated: Apr 11, 2013 |
Various |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the
Technical Panel by February 7, 2013, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00400 - Minor Amendment Omnibus 2012
Last Updated: Apr 11, 2013 |
Various |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the
Technical Panel by February 7, 2013, using the written submission form. |
| Written Submission
Hydro One |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00397 - Identification of Reliability Standards
Last Updated: Nov 29, 2012 |
Chapter 5, section 3.2 |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by October 11, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00396 - HE1 Day-Ahead Production Cost Guarantees Triggered by Ramping Limitations
Last Updated: Nov 29, 2012 |
Chapter 9, section 4.7D |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by October 11, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00395 - Limiting CMSC Payments to Constrained Off Imports into Designated Chronically Congested Areas
Last Updated: Sep 7, 2012 |
Chapter 9, section 3.5 |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by August 9, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision |
MR-00394 - Bulk Electric System Exceptions
Last Updated: Sep 7, 2012 |
Chapter 5 |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by August 9, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 | | IESO Board Decision R00 |
Amendment Proposal R01
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by August 9, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R01 | | IESO Board Decision R01 |
MR-00393 - Limiting Payments to Exports During Negative Prices
Last Updated: Sep 7, 2012 |
Chapter 9, sections 3.3, 3.5 |
| Amendment Submission Q00 |
Amendment Proposal R00
Additional Analysis
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by August 13, 2012, using the written submission form. |
| Submitted for IESO Board Approval |
IESO Board Decision
Resolution of the Board of Directors |
MR-00392 - Remove Provisions for Physical Allocation Data
Last Updated: Jun 14, 2012 |
Chapters 3, 6, 8, 9, 11, Appendix 9.1 |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by April 19, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00390 - Remove Provisions for Main/Check Meter Installations and Check Meters
Last Updated: Jun 14, 2012 |
Chapters 6, 11, Appendix 6.5, 9.1 |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by April 19, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00389 - Ancillary Services Contract Terms
Last Updated: Nov 29, 2012 |
Chapter 7, section 9.3 |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by October 11, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00388 - Cancellation of Transitional Demand Response (TDRP) and Emergency Load Reduction Programs (ELRP)
Last Updated: Feb 16, 2012 |
Chapter 5, 7, 9, 11 |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by December 22, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00387 - Monthly Generator Disclosure Report - Market Rules Clean-Up
Last Updated: Feb 16, 2012 |
Chapter 5, sections 3.2.4, 6.5.4 |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by December 22, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00386 - Minor Amendment Omnibus 2011
Last Updated: Feb 16, 2012 |
Various |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by December 22, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00385 - Real-Time Generation Cost Guarantee - Revisions to Eligibility and Cost Submissions
Last Updated: Feb 16, 2012 |
Chapter 7, section 5.7, Chapter 9, section 4.7B |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by December 22, 2011, using the written submission form. |
| Written Submission
Shell Energy |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00384 - Technical Feasibility Exceptions - Maintenance Cost Recovery
Last Updated: Dec 1, 2011 |
Chapter 5, section 3.2A |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by October 13, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00383 - Market Participant Obligation Regarding an Emergency Preparedness Plan
Last Updated: Dec 1, 2011 |
Chapter 5, sections 10.3, 10.4, 11.2, 11.3, 11.4, 11.7, Chapter 11 Definitions |
| Amendment Submission Q00 |
| Amendment Proposal R00 - The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by October 13, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
MR-00382 - EDAC Market Rules True-up Package #2
Last Updated: Sep 9, 2011 |
Chapter 7, sections 3.3A, 6.3B, Chapter 9, sections 3.1, 3.8, Appendix 7.5A |
| Amendment Submission Q00 |
Amendment Proposal R00-R02
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by August 4, 2011, using the written submission form. |
| Written Submission
Power Workers' Union |
| Technical Panel Recommendation on Amendment Proposal R00-R02 |
| IESO Board Decision |
MR-00381 - Renewable Integration | Centralized Forecasting Integration, Publication, Dispatching Variable Generation
Last Updated: Jan 3, 2013 |
Various |
| Amendment Submission Q00 |
Amendment Proposal R00: Centralized Forecasting Integration
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by July 5, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00: Centralized Forecasting Integration | | IESO Board Decision R00 |
Amendment Proposal R01: Centralized Forecasting Publication
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by July 5, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R01: Centralized Forecasting Publication | | IESO Board Decision R01 |
Amendment Proposal R02: Dispatching Variable Generation
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by September 13, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R02: Dispatching Variable Generation | | IESO Board Decision R02: Dispatching Variable Generation |
Amendment Proposal R03: Floor Prices for Variable and Nuclear Generation
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by September 13, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R03: Floor Prices for Variable and Nuclear Generation | | IESO Board Decision R03: Floor Prices for Variable and Nuclear Generation |
Amendment Proposal R04: Market Schedule and Congestion Management Settlement Credits for Variable Generation The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by September 13, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R04: Market Schedule and Congestion Management Settlement Credits for Variable Generation | | IESO Board Decision R04: Market Schedule and Congestion Management Settlement Credits for Variable Generation |
Amendment Proposal R05: Tie Breaking for Variable Generation The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by September 13, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R05: Tie Breaking for Variable Generation | | IESO Board Decision R05: Tie Breaking for Variable Generation |
Amendment Proposal R06: Publication Requirements: 5-Minute Forecast for Variable Generation The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by September 13, 2012, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R06: Publication Requirements: 5-Minute Forecast for Variable Generation | | IESO Board Decision R06: Publication Requirements: 5-Minute Forecast for Variable Generation |
MR-00379 - Effective Dates for Reliability Standards
Last Updated: Jun 16, 2011 |
Chapter 5, section 1.2, Chapter 11 definitions |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by May 12, 2011, using the written submission form. |
Written Submission
• Hydro One Networks Inc |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision |
MR-00378 - Market Monitors Sharing Confidential Information
Last Updated: Jun 16, 2011 |
Chapter 3, section 5.3, Chapter 11 definitions |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by April 14, 2011, using the written submission form. |
Written Submission
• OPG |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision |
MR-00377 - Intertie Offer Guarantee (IOG) – Revise Real-Time IOG Offset Calculation
Last Updated: May 19, 2011 |
Chapter 9, section 3.8A.4 |
| Amendment Submission Q00 |
| On May 17, 2011 the Technical Panel determined that the market rule amendment MR-00377 no longer warrants consideration. This amendment is now closed. |
MR-00376 - Market Administration – Replacing PKI Digital Certificates
Last Updated: Feb 17, 2011 |
Chapter 2, Appendix 2.2, 1.4, 1.6(new) |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by January 13, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision |
MR-00375 - Enhanced Day-Ahead Commitment Process (EDAC) Market Rules True-up
Last Updated: Sep 9, 2011 |
Chapter 7, 2.2, 2.2C, 3.3, 3.3A, 5.1, 5.5, 5.8, 6.3B, 12.1, Chapter 9, 3.1, 3.5, 3.8A, 3.8E, 4.7B, 4.7D, Chapter 11, Appendix 7.5A |
| Amendment Submission Q00 |
Amendment Proposal R00-R03
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by March 10, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00-R03 |
| IESO Board Decision |
MR-00363 - Surplus Baseload Generation - Synchronization of Non Quick-Start Facilities and Commissioning Units
Last Updated: Nov 26, 2009 |
Chapters 7 & 9 |
| Amendment Submission Q00 |
MR-00362 - Centralized Forecasting for Variable Generation
Last Updated: Jun 16, 2011 |
Chapters 4, 7, 9, 11 |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by April 7, 2011, using the written submission form. |
Written Submission
• Gary Koestler |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
Amendment Proposal R01
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by May 12, 2011, using the written submission form. |
Written Submission
• Rob Cary & Associates Inc (May 1) |
Written Submission
• Rob Cary & Associates Inc (May 11) |
Written Submission
• Penn Energy Renewables, Ltd |
Written Submission
• TransAlta Corporation |
| Technical Panel Recommendation on Amendment Proposal R01 |
| IESO Board Decision R01 |
MR-00351 - Segregated Mode of Operation as an Export
Last Updated: Oct 9, 2008 |
Chapters 7, 9 |
| Amendment Submission Q00 |
MR-00349 - Enhanced Day-Ahead Commitment Process (EDAC): Settlement Guarantees
Last Updated: Sep 9, 2011 |
Chapter 9, sections 3 and 4 |
| Amendment Submission Q00 |
| Amendment Proposal R00-R04 |
| Technical Panel Recommendation on Amendment Proposal R00-R04 |
| IESO Board Decision |
MR-00348 - Enhanced Day-Ahead Commitment Process (EDAC): 24 Hour Optimization and 3-part Offers
Last Updated: Sep 9, 2011 |
Chapters 7 and 11 |
| Amendment Submission Q00 |
Amendment Proposal R00-R05
Amendment Proposal R06
The Technical Panel requests that stakeholders review this amendment proposal (R00-R06) and provide comments to the Technical Panel by July 23, 2009, using the written submission form. |
Technical Panel Recommendation on Amendment Proposal R00-R05
Technical Panel Recommendation on Amendment Proposal R06 |
IESO Board Decision R00-R05
IESO Board Decision R06 |
|
MR-00338 - Interjurisdictional Trading - Economic Dispatch of Linked Wheels
Last Updated: May 19, 2011 |
Chapter 7 |
| Amendment Submission Q00 |
| Revised Amendment Submission Q00 |
| On May 17, 2011 the Technical Panel determined that the market rule amendment MR-00338 no longer warrants consideration. This amendment is now closed. |
MR-00297 - Outage Processing - IESO Processing of Market Participant De-Rate Submissions
Last Updated: Aug 11, 2005 |
Chapter 5, section 6.3.4 |
| Amendment Submission Q00 |
MR-00287 - Resource Adequacy Market
Last Updated: Oct 25, 2004 |
Chapter 13 |
| Amendment Submission Q00 |
MR-00286 - Day-Ahead Market - Definitions
Last Updated: Nov 5, 2004 |
Chapter 11 |
Amendment Proposal R00 - Request for Stakeholder Review and Comment The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by November 26, 2004, using the written submission form. |
MR-00276 - Day-Ahead Market - Financial Transmission Rights
Last Updated: Nov 19, 2004 |
Chapter 8, section 4 |
| Amendment Submission Q00 |
Amendment Proposal R00: Request for Stakeholder Review and Comment
The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by October 29, 2004, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
MR-00274 - Day-Ahead Market - Prudential Security
Last Updated: Nov 5, 2004 |
Chapter 2, section 5 |
| Amendment Submission Q00 |
Amendment Proposal R00-R04 - Request for Stakeholder Review and Comment The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by November 26, 2004, using the written submission form. |
MR-00272 - Day-Ahead Market - Market Participant Authorization
Last Updated: Oct 8, 2004 |
Chapter 2, section 1, 3, 3A, 4; Chapter 11 |
| Amendment Submission Q00 |
Amendment Proposal R00-R02: Request for Stakeholder Review and Comment
The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by October 29, 2004, using the written submission form. |
MR-00271 - Day-Ahead Market - Market Billing and Funds Administration
Last Updated: Oct 25, 2004 |
Chapter 9, section 6.10 |
| Amendment Submission Q00 |
MR-00270 - Day-Ahead Market - Settlement
Last Updated: Nov 19, 2004 |
Chapter 9, sections 1, 2, 3, 4 and 6 |
| Amendment Submission Q00 |
Amendment Proposal R00 - Request for Stakeholder Review and Comment The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by November 26, 2004, using the written submission form. |
MR-00269 - Day-Ahead Market - Publishing and Reporting
Last Updated: Nov 5, 2004 |
Chapter 12 |
| Amendment Submission Q00 |
MR-00268 - Day-Ahead Market - Day-Ahead Market and Real-Time Market Integration
Last Updated: Nov 5, 2004 |
Chapter 7, sections 3, 5 and 12 |
| Amendment Submission Q00 |
Amendment Proposal R00-R04 - Request for Stakeholder Review and Comment The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by November 26, 2004, using the written submission form. |
MR-00267 - Day Ahead Market - Bids, Offers and Data Input
Last Updated: Oct 25, 2004 |
Chapter 12 |
| Amendment Submission Q00 |
Amendment Proposal R00-R01 - Request for Stakeholder Review and Comment The Technical Panel requests that stakeholders review the draft amendment proposal and submit any comments to the Panel by November 12, 2004 using the Written Submission form. |
MR-00266 - Day-Ahead Market - Facility Registration
Last Updated: Nov 19, 2004 |
Chapter 12 |
| Amendment Submission Q00 |
Amendment Proposal R00-R04: Request for Stakeholder Review and Comment
The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by October 29, 2004, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00-R04 |
MR-00265 - Day-Ahead Market - Calculation Engine
Last Updated: Nov 5, 2004 |
Chapter 12 |
| Amendment Submission Q00 |
Amendment Proposal R00 - Request for Stakeholder Review and Comment The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by November 26, 2004, using the written submission form. |
MR-00264 - Day-Ahead Market - Market Operations
Last Updated: Nov 5, 2004 |
Chapter 12 |
| Amendment Submission Q00 |
Amendment Proposal R00 - Request for Stakeholder Review and Comment The Technical Panel requests that stakeholders review this draft amendment proposal and provide any comments to the Technical Panel by November 26, 2004, using the written submission form. |
MR-00252 - Congestion Management - Recovery of Generator CMSC
Last Updated: Dec 1, 2011 |
Chapter 9 section 3.5 |
| Amendment Submission Q00 |
Amendment Proposal R00
The Technical Panel requests that stakeholders review this amendment proposal and provide comments to the Technical Panel by Septmber 15, 2011, using the written submission form. |
| Technical Panel Recommendation on Amendment Proposal R00 |
| IESO Board Decision R00 |
|